BJC PRIMARY DATA CENTER

SIZE
40,000 SF
COMPLETED
2010
EXPERTISE
Planning, Architecture
Interior Design, Graphic Design

AWARDS
LEED Gold Certification 

DATA
Consistent with Tier 3 Design Criteria per 
Uptime Institute Standards and TIA-942 Guidelines;N+1 Redundancy, 
Mechanical System, 2N Redundancy,
Electrical System, F3 Tornadic Resistance
1.5 Seismic Design Level, 1.5 Importance Factor

Arcturis worked closely with both the BJC facilities team and their IT team to create their primary data facility. The design had to meet all their needs for data protection. The final facility sacrificed nothing in terms of redundancy, reliability or structural strength, while fulfilling all the design requirements of the master plan.


Back to Data Centers >>