Arcturis designed a three-level, open air parking garage for 1,165 cars at Edwards Jones’ campus in the ASU Research Park in Tempe, AZ. The project was built in two phases. The south leg of the parking garage was constructed first on unoccupied land. Then the north leg was built since it occupied part of an existing surface parking lot. The finished garage is three levels above grade with the top level open. The covered levels are open air and did not require mechanical ventilation. Also included in the design is a green screen, native plants, and recycled brick for the gravel.